Maximizing vertiport passenger throughput while avoiding ground gridlock and battery thermal throttling.
Because physical vertiport footprints are tightly constrained in dense city centers, arriving eVTOLs cannot linger on the final approach pad. Slots are synchronized with 15-second tolerances, coordinating descent with tow tractors and passenger egress.
High-rate charging generates immense heat in battery packs. The scheduling engine pairs landing slots with chilled coolant charging stations to ensure battery packs reach safe flight temperatures before the next departure.